Overview of the most important references from the last 3 years

Work history

2014
VLB Leitungsbau GmbH
2014
Construction of 53 km of new 400 kV high-voltage lines, including tower erection and support during conductor stringing works, SvK Sweden, 1,636 t.
2018
CTEAM Leitungsbau Österreich GmbH
2018–2020
Pre-assembly, erection and inspection of 220 kV towers, St. Peter – Ernsthofen, 2,400 t.
2019
CEIT S.p.A.
2019–2020
Open Fiber – Apulia, excavation works for fibre-optic cable installation.
2019
CTEAM Leitungsbau Österreich GmbH
2019–2021
Pre-assembly, erection and inspection of 220 kV towers, Weinviertelleitung, 615 t.
2020
TERNA S.p.A.
2020
Safety works on the section between towers 1–3 of the 132 kV line no. 847 “Albiano – Avenza” (Liguria). Replacement of 2 towers and execution of mid-span joints.
2020
LTB Leitungsbau GmbH
2020
Crossarm pre-assembly and refurbishment of 380 kV towers, Kupferzell – Stalldorf.
2020
CTEAM Leitungsbau Österreich GmbH
2020–2021
Pre-assembly, erection and inspection of towers on the 110 kV UW Groß Gerungs – UW Gmünd line, 1,479 t.
2020
COGET Impianti S.p.A.
2020–2021
Pre-assembly and inspection works on the 380 kV Weinviertelleitung – Auersthal line.
2021
TERNA S.p.A.
2021
Diversion of the 132 kV T.141–T.142 lines near the Chiari electrical substation (BS). Dismantling and erection of 2 towers, including conductor stringing works.
2021
TERNA S.p.A.
2021
Refurbishment of foundations and tower legs on the 220 kV line no. 22121B1 “Villasor 1 – Selargius”, AOT Cagliari 150 kV.
2021
European Trans Energy GmbH
2020–2021
Pre-assembly, erection and inspection of the 110 kV Ebensfeld – Steinbach line, 324 t.
2021
CTEAM Leitungsbau Österreich GmbH
2021–2022
Pre-assembly, erection and inspection of towers on the 110 kV Ried – Raab line, 565 t.
2022
VLB Leitungsbau GmbH
2021–2022
Pre-assembly, erection, conductor stringing and inspection of 380 kV towers, Salzburgleitung Baulos II + III (A), 1,900 t.
2022
VLB Leitungsbau GmbH
2022–2023
Pre-assembly, erection and inspection of towers on the 110 kV Pottenbrunn – Bergern line.
2022
LTB Leitungsbau GmbH
2022
Pre-assembly and erection works on the 380 kV Bertikow – Pasewalk overhead line, 460 t.
2022
LTB Leitungsbau GmbH
2022
Refurbishment of 110 kV towers, UA Hiesfeld, BL 0816 (25 t of tower shafts and 4.5 t of crossarms).
2022
LTB Leitungsbau GmbH
2022–2023
Pre-assembly and erection works on the 380 kV Uckermarkleitung – Los 6.1 Neubau, 1,550 t.
2023
50Hertz
2023–2024
Pre-assembly, erection and dismantling works on the 380 kV Röhrsdorf – Weida – Remptendorf line, Los 3, 1,485 t.
2023
CTEAM Leitungsbau Österreich GmbH
2023–2024
Pre-assembly and erection works on the 220 kV Ernsthofen – Hütte Süd (Au) line, 2,200 t.
2024
LTB Leitungsbau GmbH
2024–2026
Pre-assembly, erection and dismantling works on the 380 kV Ultranet B1 section, Pkt. Wallstadt – Philippsburg converter station, Lots 1–2–4–6, 5,000 t.
2024
Amprion
2024–2025
Pre-assembly and erection of 380 kV towers, 1,200 t; tower reinforcement comprising 10.5 t for the shaft and 2 t for the crossarm; erection of a temporary 125 t overload structure, Bl. 4531 GA3 (Germany).
2025
Amprion
2025
Erection of 380 kV towers, Bl. 4225 GA3, Lot 3, towers 1–19 and 260–265, 1,200 t.
2025
Amprion
2025
Ancillary conductor stringing works on the 110/380 kV Metternich–Niederstedem line, Bl. 4225 GA3, Lot 2.
2026
50Hertz
2026–2027
Pre-assembly and erection of towers for FL/551357 50Hertz ERSATZ Südharz, Lots 2 and 3, towers 473–474, approximately 3,400 t.